Project Details
UCSF Medical Center Nitrogen System is located within an interior room of the hospital where there were unrelated seismic noncompliance issues, so the project also included bringing the entire room into Code compliance.
Finn Design Group (now merged with PASE) prepared structural drawings and structural calculations for the project, including details for:
- LN Dewar enclosure rack, with doors and provision for condensate drainage;
- Suspended Utility Bracing
- Multi-Cylinder Storage Racks
- Suspended Vaporizer Mounting
- Fan & Duct Support
- Ramp and Platform Construction
Finn Design Group worked closely with the project Architect, Mechanical Engineer, and Facilities Engineer to achieve successful completion of the project.