This project consists of the construction of a seven-story hotel that encloses 215,000 SF of space and free-standing two-story (three-level) parking garage. The scope of work included redesigning the building to conform to the 2010 CBC, changing the exterior skin of the building to plaster over metal stud and reviewing the option of changing the roof structure above the central area from structural steel to concrete.