Project Details
The Cristo Rey High school is constructed of concrete slabs over metal deck, steel beams/columns and open web steel joists. The lateral load resisting system is based on concentric braced frames, and the foundation consists of a reinforced concrete mat, overlain by a micro-reinforced concrete topping slab.